Workshop label systems / Electronic work instructions

// SYS 04 · Electronic work instructions

Electronic work instruction system

Land e-WI by fixing which steps must confirm before a station label: survey changeover pace and illustrated versioning, pilot station screens through critical confirms then LuckDesign/LuckNext print—template approval stays on its product page; don’t stuff process books into the designer.

Get a landing plan Back to overview

-40%Changeover training time
-35%Defects from skipped steps
14天Typical go-live

Before cutover: paper SOP on the wrong page—labels already print

Common blockers before go-live

  • Surveys don’t split critical vs browse steps—pilots are too strict or too soft.
  • SOP versions and label templates change separately—acceptance can’t align them.
  • Changeover day skipped in the pilot—old steps stay reachable after cutover.

How we connect at landing

  • Survey critical steps, image sources, and screen placements.
  • Pilot: WO loads current SOP → critical confirms → print.
  • Acceptance includes changeover switch and version align; capability note on template-print-approval.

How we survey and pilot the line

On high-mix lines, consultants shadow a changeover: whether old folders remain, when the new SOP hits the screen, and when WIP labels are opened.

First wave gates only 2–3 high-risk steps; others stay browse-confirm to protect pilot takt.

From survey to acceptance

  1. Survey: product families, SOP library, screens, station label samples.
  2. Gate: critical-step list and “no confirm, no print.”
  3. Load: illustrated steps on screen by WO/product.
  4. Templates: approve station labels in LuckDesign; bind variables.
  5. Pilot: include one full changeover day.
  6. Cutover: roll station by station; retire paper copies.
  7. Accept: skip blocks, version recall, print history.

Consistency · Same SOP

No stale paper after changeover.

Gate · Steps before print

Critical incomplete → no print.

Fit · WI vs labels split

Process on screen; layout stays in Luck.

Survey critical steps → pilot SOP on screen → confirm → LuckDesign/LuckNext print → changeover cutover → accept

Share changeover pace and critical steps—we’ll map an e-WI landing.

Get a landing plan Back to overview

How print connects to LuckDesign / LuckNext

Station print unlocks only after critical step confirms: layouts stay approved in LuckDesign, release via LuckNext when needed; SOP version can land in print notes.

Related landings & capability notes

FAQ

Build SOP inside LuckDesign?

Not recommended—land illustrated WI on screens and keep label layouts separate.

Scan every step?

Configurable by risk—force confirm on critical steps; browse-only on others per process.